Opportunities for business exisit in the transport sector: Air, Rail, Road and SMEs for the domestic routes that can be serviced for the benefit of the general populace.
Air Transport
CAAZ is in the process of rehabilitating it's Airports Runways and Buildings joint partnerships are welcome in this regard for a brief overview of the scope of work and funding requirements in Millions of Dollars, see the list below
Harare International Airport
Extension of Terminal building, including repositioning of VIP state pavilion, and Installation of 3 Aerobridges requires 62,5
Radar Surveillance
Surveillance equipment requires 25
Joshua Mqabuko Airport
Rehabilitation of runway and installation of AGL requires 35
Charles Prince
Rehabilitation of runway and taxiway and Construction of a new Terminal building requires 20
Hwange National Park
Runway Rehabilitation of 4km Runway requires 15
Masvingo
Rehabilitation of runway and 300m extension and rehabilitation of building requires 20
Kariba
Construction of new runway, taxiway, apron Building, new terminal building and access road requires 173
Gweru
Rehabilitation and Construction of a new terminal building requires 10
Beitbridge
Construction of Asphalt overlay and new Terminal building requires 20
Buffalo Range
Rehabilitation and extension of runway from 1578m to 4000m and Construction of a new terminal building requires 15
Mutare Grand Reef
Construction of new runway, taxiway, apron building, new terminal building and access road requires 173
Rail
As we prepare for a restoration of the greatest ever economy in the Southern Region of Africa Railway lines will be busier than ever before and here is your opportunity to be part and parcel of this huge Rehabilitation of the rail network, Rehabilitation of the rail track, Refurbishment of traction and rolling stock, Rehabilitation of the signalling and telecommunications system.
The following routes will be concessioned and all rehabilitation works will be done through PPP funding. Private players will operate their rolling stock.
- Harare-Machipanda [Forbes border post (Zimbabwe/Mozambique)]
- Dabuka to Chicaulacuala [Sango border post (Zimbabwe/Mozambique)]
- Harare-Dabuka- Beitbridge
- Vic. Falls – Bulawayo –Dabuka- Harare
Roads
Vast opportunities await you in the Construction of toll gates, Installation of computerised accounting system for accountability and effective monitoring of funds and as you may have guessed these roads are waiting to be rehabilitated.
- Buchwa-Rutenga-Boli- Sango Border Post (203km)
- Mt Darwin-Mukumbura (80km)
- Bindura-Shamva (7km)
- Wedza-Sadza (22km)
- Kwekwe-Lupane (40km)
- Murambinda-Birchenough Bridge (123km)
- Gutu-Kurai (22km)
- Headlands- Mayo (40km)
- Mvurwi-Kanyemba (150km)